On behalf of Fletchers, CLL completed the foundation works for a 16,735 square metre building which, will have a level of retail space and six levels of office space in Wynyard Quarter.
The foundation works involved CLL completing 108 piles – deepest of these piles 36m x 150mm dia incl 5.0m dead drilling. CLL also completed a 200m sheet pile perimeter wall with sheets down to 18m deep. Logistically the site was very tight, the site contained: 4 x cranes; 2 x drill rigs; 2 x support machines; 3 x vibe power packs; 1x EWP; 1 x crane generator; 1 x tower crane base; and 1 x excavator removing spoil.