CLL completed the ground works at Browns Bays new apartment complex. These works included three different types of piling. Driven steel piles reinforced concrete piles and a secant wall.
The secant piles are the formation of overlapping concrete piles. Typically alternate unreinforced piles are formed using lower strength concrete. The remaining piles are standard reinforced concrete piles and are reinforced with either steel rebar or with steel beams and are constructed by either drilling under mud or augering. Secant walls are also used due to having minimum impact on the surroundings